EPC Uxbridge: Quotes for Homes and Business Premises
Hillingdon Council tells landlords to gather their Energy Performance Certificate, with the gas and electrical certificates, ahead of the next phase of the Renters' Rights Act. For an EPC Uxbridge quote, pick EPC in the form and enter the postcode, whether it is a home or business premises. Where we can, a participating independent professional picks it up.
What does Hillingdon say landlords should have ready?
The Energy Performance Certificate (EPC), the Gas Safety Certificate and the Electrical Installation Condition Report (EICR). Hillingdon's Renters' Rights page puts these on a short list of documents to collect early, under how to prepare for Phase 2 (late 2026).
The page also asks landlords to:
Does a business premises in Uxbridge need an EPC?
Yes, business premises need an EPC when they are rented out, sold or newly finished. GOV.UK sets out the business rules, and the table shows them:
| Rule | What applies | Source |
|---|---|---|
| When it is needed | You rent out or sell the premises, or a building under construction is finished. | GOV.UK business premises |
| Fine | Between £500 and £5,000, based on the rateable value, if you do not make an EPC available to a prospective buyer or tenant. | GOV.UK business fine |
| Display | Fix it to the building if the floor area is over 500 square metres, the public visit frequently and an EPC already exists. | GOV.UK display |
| Validity | All EPCs are valid for 10 years. | GOV.UK validity |
What EPC rules apply to homes in Uxbridge?
Homes need one when they are sold, rented out or newly built. GOV.UK says to order the EPC before you start marketing the property, that it rates a property from A (best) to G (worst), that it is valid for 10 years, and that sellers and landlords must show it to anyone buying or renting. Hillingdon has a large rented sector.
The 2021 Census tenure table counts 28,276 private renting households out of 109,228, or 25.9%, compared with 20.5% for England, roughly a quarter of households, counted for the whole borough and not only Uxbridge.
For rented homes the minimum is band E, unless a valid exemption has been registered. GOV.UK applies this to rented homes in England and Wales from 1 April 2020, and the non-domestic guidance applies it to all privately rented non-domestic properties from 1 April 2023.
Which Uxbridge business buildings do not need an EPC?
Some do not, if you can show that the building is one of these, according to GOV.UK:
How does an EPC quote work for an Uxbridge property?
An EPC Uxbridge enquiry follows four steps:
Tell us what you need
Choose the property safety service required.
Tell us where
Enter the property postcode and relevant details.
We match your enquiry
ChecksSorted identifies an appropriate participating professional covering the service and location.
Discuss the job
The professional contacts you about availability, price and the work required.
Which answers does the EPC quote form ask for?
Four: the location, the reason, the size and any existing certificate. The table gives an example answer for each:
| The form asks | An example answer |
|---|---|
| Where is the property? | An Uxbridge postcode, with Uxbridge as the town |
| Why do you need the EPC? | A sale, a let, a new build or something else |
| How big is it? | A bedroom count from 1 to 5 or more for a home, or an approximate floor area for premises that are not a home |
| Is there one already? | Yes, no or not sure |
Which other checks does Hillingdon list for landlords?
A landlord can ask for a gas safety certificate and an EICR for the same property, the two documents Hillingdon lists next to the EPC. See all five services on the Uxbridge page, and the national rules on the EPC page.
Frequently Asked Questions
Who can give me an EPC in Uxbridge?
An accredited assessor can. To reach one for an EPC Uxbridge quote, send the form with EPC chosen and the postcode filled in, and we pass the enquiry on where we can.
When does the Renters' Rights Phase 2 start?
Hillingdon's page gives Phase 2 as late 2026. It also says Phase 1 started on Friday 1 May 2026 and that Phase 3 has a timescale to be confirmed.
Can I appeal a penalty for a business EPC?
Yes, within a time limit. GOV.UK says you can appeal to the county court, but you must do this within 28 days of receiving your confirmed penalty.
Is an EPC the same as an energy bill estimate?
No, but it includes typical costs. GOV.UK says it holds information about a property's energy use and typical energy costs, plus steps to improve its energy efficiency.
Does the price of an EPC change for business premises?
It can. GOV.UK says the cost varies by assessor and the size of the property, and the form asks for the rough floor area of business premises. No amount is shown here, because the EPC Uxbridge quote comes from the professional.
Send your EPC Uxbridge quote request
Choose EPC, say if it is a home or business premises, then submit.
Request a Quote